January 19, 2009
The door/window crew is back and turning the back doors around.
The threshold had to be turned around too.
The pry bar that was used to remove the door framing.
The pile of scrap channel on the ground will hopefully find a use in the myriad
of small projects that will be done inside the house.
The scrape marks in the caulking were from the pry bar being used to lift the door framing to break it free from the caulking.
There was a bit of trim above the back doors that hadn't been put in yet.
Since the doors had to be removed for turning, Shannon thought it a good time to "git-er-done"!
The properly facing doors after having been rotated...
Recalked...
Repositioned...
Refastened...